Replacing a roof can be expensive but if a roof contains only a small slope it s possible to raise the roof pitch of a house by building a roof over the old one.
Raise roof on shed.
Prepping for the lift.
The timber roof frame is rotten in parts and will need replacing.
To ensure complete coverage make sure the bottom edge of each strip overlaps the top of the strip below it by at least.
At the drawing board.
Double check that your roofing felt is straight flush and wrinkle free before stapling it down.
Raising a shed dormer roof hatching a plan.
The walls of the shed are decorative concrete blocks.
And although almost any roof can be raised the cost of raising a very large or complex roof may outweigh the benefits.
This new roof with a higher pitch can be accomplished with premade roof trusses and typical asphalt shingles.
Cost of raising a roof on a house.
3 jack up the corner just slightly higher than the.
We have an old asbestos super 6 roof being removed from our shed this week.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
Roofing felt can be used on its own as a cheap and easy surfacing solution or.
Our first task was to create an accurate drawing of the existing site conditions such as the.
The shed roof doesn t have a peak.
A truss framed roof on the other hand doesn t have any attic space to expand you re probably going to have to raise a truss framed roof to get more space.
Nationally the cost to replace or install a roof is about 8 000.
There are six separate cost sections for raising a roof.
It typically costs between 15 000 and 125 000 and up to raise a roof on a house removing replacing or moving plumbing and electrical work can increase price.
The third basic dormer type is the shed dormer which looks like a lean to shed rising from the roof of the house.
It runs in the same direction as the house roof but it has a flatter slope reaching the eaves at a point that is just about the height of the ceiling inside.
The cost breaks down to 40 materials and 60 labor if there s a problem that needs fixed roof repairs averages at 850.
The primary consideration was how quickly we could get the existing roof demolished and the new one.